Cable-Bridge Karimnagar
| Kareemnagar Cable Bridge | |
|---|---|
| Official name | Kareemnagar Cable Bridge |
| Country | India |
| Location | Kareemnagar, Telangana |
| Status | Ready to be Inaugurated |
| Construction began | 2020 |
| Opening date | 2022 |
| Dam and spillways | |
| Type of dam | Barrage |
| Impounds | Maneru River |
| Length | 680 m (2,231 ft) |
Karimnagar Cable Bridge is a cable bridge in Karimnagar town of Telangana state. It is a state-of-the-art, high-strength cable-stayed bridge over the Maneru River below the Lower Maner Dam. This cable bridge, built by the Telangana government as part of Karimnagar urban development, has won an award at the national level in the Outstanding Concrete Structure-2021 category.
Structure
As vehicles going from Karimnagar town towards Warangal and Hyderabad have to pass over the Alugunoor bridge, traffic problems often arise. The 680 meter long bridge was built at a cost of 183 crore rupees to solve the traffic problem. After crossing the Maneru river from Karimnagar Kaman through the housing board, it will be linked to the Warangal highway from Sadashivapalli under Manakondur constituency. This will reduce the distance to Warangal by seven kilometers.
Built with foreign technology to attract tourists, this cable bridge has 220 meter high pylons on both sides and connects the pylons with 136 segments without any hindrance to boat travel in Maneru river.
Experiment
Load testing was conducted from 25th to 29th June 2021 in the presence of road and building authorities to test the capacity of this bridge. The capacity of the bridge was tested at different stages for five days. As part of the test procedures, a total weight of 950 tonnes (28 tippers on the bridge filled with sandbags of 30 tonnes each. The weight of 28 sand tippers is 840 tonnes) was placed on the main span of the bridge on 25th and 26th. Apart from this, sandbags of 110 tonnes capacity (55 tonnes per side) were also placed on the developed footpaths on both sides of the bridge. Sensors have been installed at 7 places under the bridge and checked by the officials every hour. On the 29th, 20 vehicles were filled with sand and sandbags were placed on the footpaths to assess the capacity of the bridge.