The Exploration Ground Systems (EGS) Program (formerly the Ground Systems Development and Operations Program[1]) is one of three NASA programs based at NASA’s Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport and launch.[2] Unlike previous work focusing on a single kind of launch vehicle, such as the Saturn V or space shuttle, EGS is preparing the infrastructure to support several different kinds of spacecraft and rockets that are in development, including NASA’s Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1).[3] [4] This ambitious mission is the first in a series of increasingly complex missions that will enable human exploration to the Moon and Mars.[5] [6] [7]
EGS Assets
- Vehicle Assembly Building
- Launch Control Center, Firing Room 1
- Crawler-transporter
- Mobile Launcher
- Launch Pad 39B
Launch Director
Charlie Blackwell-Thompson serves as launch director for NASA's Exploration Ground Systems Program. She will oversee the countdown and liftoff of NASA's Space Launch System rocket and Orion spacecraft during its first flight test, called Exploration Mission-1. Named to the position in January 2016, Blackwell-Thompson is NASA's first female launch director.[8] [9]
Milestones
Aug. 31, 2018 - The mobile launcher (ML) arrives at Launch Pad 39B. The ML underwent a fit check, followed by several days of systems testing.[10]
Sept. 8, 2018 - The mobile launcher, atop crawler-transporter 2, moves into the VAB for the first time.[11] [12]
Oct. 17, 2018 - The first high speed retract test was completed on the Orion Service Module Umbilical (OSMU) on the mobile launcher (ML). The test verified umbilical arm alignment, rotation speed, and latch back systems. The OSMU will transfer power, data, and coolant for the electronics, and purge air for the environmental controls to the Orion service module and Launch Abort System.
Oct. 30-Nov. 6, 2018 - Underway Recovery Test-7 (URT-7) was conducted in the Pacific Ocean. URT-7 is one in a series of tests that the Exploration Ground Systems Recovery Team, along with the U.S. Navy, are conducting to verify and validate procedures and hardware that will be used to recover the Orion spacecraft after it lands in the Pacific Ocean following deep space exploration missions.[13] [14]
Nov. 19, 2018 - The Crew/Service Module Mock-up and Orion Transportation Pallet (OTP) were successfully moved to the Servicing Stand, as part of the Handling and Access (H&A) subsystem Verification and Validation testing at the Multi Payload Processing Facility (MPPF). This testing allowed the Exploration Ground Systems (EGS) team to verify access to several servicing panels on the Orion vehicle, which will be needed to prepare Orion for Exploration Mission-1.
Dec. 14, 2018 - Successful countdown demonstration completed, intended to validate the launch team's capability to perform an EM-1 countdown and respond to challenges put into the system for practice.[15]
See also
References
- ↑ "Exploration Ground Systems Highlights, Message From the Director" (PDF). NASA. November 2018. Retrieved February 26, 2019.
- ↑ "Exploration Ground Systems". NASA. August 21, 2018. Retrieved October 10, 2018.
- ↑ "Exploration Ground Systems Overview". NASA. June 20, 2018. Retrieved October 19, 2018.
- ↑ "Exploration Ground Systems, Jacobs practice building SLS boosters in the VAB". NASASpaceFlight.com. April 17, 2018. Retrieved February 26, 2019.
- ↑ "Around the Moon with NASA's First Launch of SLS with Orion". NASA. July 9, 2018. Retrieved October 19, 2018.
- ↑ "EXPLORATION MISSION-2 GETS A RE-DO". spacepolicyonline.com. April 25, 2018. Retrieved February 26, 2019.
- ↑ "An overview of NASA's exploration mission 2 (EM-2)". IEEE Xplore. June 28, 2018. Retrieved February 26, 2019.
- ↑ "Charlie Blackwell-Thompson Biography". NASA. April 2016. Retrieved November 20, 2018.
- ↑ "Onward and Upward". Vogue. March 8, 2017. Retrieved February 26, 2018.
- ↑ "SLS Mobile Launcher Arrives At Pad 39B". SpaceRef.com. September 5, 2018. Retrieved February 28, 2019.
- ↑ "KSC-20180908-PH_CHS01_0126". NASA. September 8, 2018. Retrieved January 7, 2019.
- ↑ "Jacobs Supports NASA in Hitting Major Milestone at Kennedy Space Center". MarketWatch. September 25, 2018. Retrieved February 26, 2019.
- ↑ "KSC-20181101-PH_KLS02_0009". NASA. November 1, 2018. Retrieved January 3, 2019.
- ↑ "Navy, NASA complete underway recovery test 7". MilitaryNews.com. November 12, 2018. Retrieved February 26, 2019.
- ↑ "KSC-20181214-PH_KLS01_0058". NASA. December 14, 2018. Retrieved January 3, 2019.
External links
- Exploration Ground Systems Website at NASA.gov
- Exploration Ground Systems Facebook
- Exploration Ground Systems Twitter
- Launch Director Charlie Blackwell-Thompson Bio at NASA.gov
Category:NASA Category:NASA programs
Category:Orion program
NASA's Exploration Ground Systems
This article "Exploration Ground Systems" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Exploration Ground Systems. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
| This page exists already on Wikipedia. |