Hub Canal
From EverybodyWiki Bios & Wiki
Old Hub Canal
As of 13 August 2025, Old Hub Canal is under renovation.[1][2] The old canal is 50 years old.[2]
New Hub Canal
On 13 August 2025, Bilawal Bhutto inaugurated New Hub Canal.[1] Capacity of the new canal is 100 MGD (million gallons per day), while canal supply water from Hub Dam to Karachi.[2] The canal will serve people in Keamari District and Karachi West.[3] The cost of New Canal is Rs 12.8 billion.[3]
See also
References
- ↑ 1.0 1.1 "Bilawal inaugurates new Hub canal to address Karachi's water crisis". The Express Tribune. 2025-08-13. Retrieved 2025-08-15.
- ↑ 2.0 2.1 2.2 Ayub, Imran (2025-07-20). "Hub Canal, Korangi causeway among six projects to be ready in weeks, says mayor Karachi". DAWN.COM. Retrieved 2025-08-15.
- ↑ 3.0 3.1 Siddiqui, Tahir (2025-07-24). "Rs12.8bn new Hub Canal to become operational on Aug 14". DAWN.COM. Retrieved 2025-08-15.
This article "Hub Canal" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Hub Canal. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
