You can edit almost every page by Creating an account and confirming your email.

Invisible Lost Time

From EverybodyWiki Bios & Wiki


Invisible Lost Time (ILT) related to routine rig drilling operations is the difference between actual operational duration and a best practice target. It is invisible because it does not appear on any conventional morning reports.

The measurement of Invisible Lost Time starts by analyzing each individual key performance indicator (KPI) that can be produced by a particular crew (drilling crew, casing crew, etc.), by a machine-automated operation, or a combination of both. The measurement of Invisible Lost Time was first developed and used by Statoil and TDE.[1]

File:ILT LT grafik.png
A diagram of the process times
  • BOBT – the time needed when drilling and producing a hole.
  • FLAT time – The necessary time needed for constructing a well besides the BOBT (BHA handling, tripping, running casing, BOP work, drilling connections, etc.).
  • LT – The deviation from plan (problem time) due to unexpected/unplanned events like hole problems, tool failures, rig repair etc.

References

  1. Andersen, Ketil; Sjowall, Per Arild; Maidla, Eric Edgar; King, Buddy; Thonhauser, Gerhard; Zollner, Philipp (2009). "Case History: Automated Performance Measurement of Crews and Drilling Equipment". SPE/IADC Drilling Conference and Exhibition. Society of Petroleum Engineers. doi:10.2118/119746-ms. ISBN 9781555632137.

Source: Case History: Automated Drilling Performance Measurement of Crews and Drilling Equipment. Ketil, M., Per Arild, S., StatoilHydro, Maidla, E.E., King, B., Nexen Data Solutions Inc., Thonhauser, G., Zoellner, P., TDE GmbH, SPE/IADC 119746, 2009


This article "Invisible Lost Time" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Invisible Lost Time. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.