Jumeirah Business Center Towers
This article's factual accuracy may be compromised due to out-of-date information. (December 2012) |
Jumeirah Business Center Towers (JBC) | |
---|---|
Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value). | |
General information | |
Status | Complete (towers 1, 2, 3, 4, 5); Approved (towers 6, 7, 8, 9) |
Type | Commercial |
Location | Dubai, United Arab Emirates |
Estimated completion | 2009-2012 |
Height | |
Roof | Mixed |
Technical details | |
Floor count | Mixed |
Lifts/elevators | 8 |
Design and construction | |
Architect | National Engineering Bureau |
Developer | Al Fajer Properties |
Jumeirah Business Center Tower's are a collection of nine free-hold commercial towers being developed in plots G2, V1, Y1, N3, W1, L1, H1, G3, and H3 of the Jumeirah Lake Towers (JLT) Community in Dubai, UAE.[1] The towers were designed by National Engineering Bureau and are being developed by Al Fajer Properties (AFP). These consist of a leaseable area of 3,600,000 square feet (330,000 m2) and an additional 150,000 square feet (14,000 m2) dedicated to retail across all nine towers.
Phase 1 Completed by Al Fajer Properties[edit]
Phase one of the project was awarded to Dubai-based property developer-Al Fajer Properties. AFP is the premier developer in the Jumeirah Lakes Towers (JLT) community and is the only developer to include a five-floor atrium within the lobbies of its towers. The first phase of the development consists of five towers and adds 2,000,000 sq ft (190,000 m2) of office space and an additional 83,000 sq ft (7,700 m2) of retail space within the Jumeirah Lake Towers Community. Al Ahamdiah Contracting (AFP's main contractor), enabled the project to achieve a rate of a 4-day cycle per floor for phase 1, which has resulted in five towers being built in a span of twelve months [2]
Phase 1 Towers[edit]
Jumeirah Business Center 1 (JBC 1) Plot G2 - Jumeirah Lake Towers Status: Completed
Jumeirah Business Center 2 (JBC 2) Plot V1 - Jumeirah Lake Towers Status: Completed
Jumeirah Business Center 3 (JBC 3) Plot Y1 - Jumeirah Lake Towers Status: Completed
Jumeirah Business Center 4 (JBC 4) Plot N3 - Jumeirah Lake Towers Status: Completed
Jumeirah Business Center 5 (JBC 5) Plot W1 - Jumeirah Lake Towers Status: Completed
Phase 2[edit]
Phase 2 consists of four commercial buildings, JBC 6, JBC 7, JBC 8 and JBC 9. The addition of these four towers will add 1,600,000 sq ft (150,000 m2) of office space and an additional 66,000 sq ft (6,100 m2) of retail space within the Jumeirah Lake Towers Community and is dedicated to the highest green building codes complementing the green mandate set out by the Dubai Government.