You can edit almost every page by Creating an account and confirming your email.

NAIA Terminal 3 station

From EverybodyWiki Bios & Wiki

Template:Prod llm/dated

NAIA Terminal 3
 9 
LocationAndrews Avenue, Pasay
Owned byDepartment of Transportation (DOTr)
Line(s)Lua error: expandTemplate: template "Manila MRT color" does not exist.
Platforms1 island platform
Tracks2
Connections
Construction
Structure typeUnderground (cut-and-cover)
Platform levels4
ParkingYes (Ninoy Aquino International Airport Terminal 3)
Other information
StatusUnder construction
Station codeTemplate:Manila MRT station code
History
Opened2032 (2032) (expected)
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Manila MRT' not found.

NAIA Terminal 3 station is an underground rapid transit station under construction on the Metro Manila Subway (Line 9). Located adjacent to the Ninoy Aquino International Airport Terminal 3 complex along Andrews Avenue in Pasay, the station serves as the southern terminus for the subway's airport spur line segment. It will also be the first rapid transit station that will provide direct access to the Ninoy Aquino International Airport.

History

The Department of Transportation (DOTr) officially awarded Contract Package 109 (CP 109) to the joint venture of Taisei Corporation and D.M. Consunji, Inc. (DMCI) in April 2026.[1] The 16.06-billion contract package covers the civil engineering and construction of the subterranean airport terminal and its corresponding connection tunnels.[2]

The joint venture also worked on the North–South Commuter Railway (NSCR) Solis–Bocaue section, but they withdrew from the first section of the contract (Solis to Valenzuela) in May 2023 due to right of way (ROW) problems with the NLEX Harbor Link Segment 10.[3]

References

  1. Galvez, James (19 May 2026). "DMCI Wins P16-B Contract for NAIA Spur of Metro Manila Subway". Philippine Resources Journal. Retrieved 21 June 2026.
  2. "Taisei–DMCI JV Secures ₱16.03 Billion Contract for Metro Manila Subway's NAIA Terminal 3 Station and Tunnels". Tunnelbuilder. 4 July 2026. Retrieved 21 June 2026.
  3. Cordero, Ted (30 May 2023). "DOTr, DMCI-Taisei withdraw from Section 1 of North-South railway contract package 1". GMA News Online. Retrieved 21 June 2026.


This article "NAIA Terminal 3 station" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:NAIA Terminal 3 station. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.