Nur Navoi solar farm
| Nur Navoi solar farm | |
|---|---|
| Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). | |
| Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value). | |
| Official name | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Country | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Location | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Coordinates | 40°04′01″N 65°05′23″E / 40.066982283516296°N 65.08970260952682°ECoordinates: 40°04′01″N 65°05′23″E / 40.066982283516296°N 65.08970260952682°E Fatal error: The format of the coordinate could not be determined. Parsing failed. |
| Status | Operational |
| Construction began | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Commission date | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Decommission date | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Construction cost | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Owner(s) | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Operator(s) | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Employees | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Min. source temp. | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Wells | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Hot water output | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Reactors | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Reactor supplier | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Solar farm | |
| Type | Flat-panel PV |
| Primary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Secondary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Tertiary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Crosses | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Site area | 700 acres (283 hectares) |
| Chimneys | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Cooling towers | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Cooling source |
|
| Annual revenue | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Thermal capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Power generation | |
| Nameplate capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Capacity factor | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Annual net output | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Storage capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| External links | |
| Website | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Commons | [[Commons:Category:Lua error in Module:Wikidata at line 446: attempt to index field 'wikibase' (a nil value).|Related media on Commons]] |
The Nur Navoi solar farm (Uzbek: Navoiy Nur quyosh elektr stansiyasi) is a solar power plant located in Karmana District of Navoiy Region, Uzbekistan. It covers an area of 283 hectares and has a total installed capacity of 100 megawatts (MW), making it the first solar park in Uzbekistan. The park was developed in three phases since 2019, with $110 million in funding from Masdar, a UAE government company. The park contributes to Uzbekistan's renewable energy goals and helps reduce greenhouse gas emissions by an estimated 150 thousand tons per year.[1].
Nur Navoi is Uzbekistan’s first utility-scale and first successfully-financed independent power producer solar project[1]. The owner and operator of the park, Masdar, commits to supply electricity for 25 years at 2.679 cents per kilowatt-hour.
In October 2019, the Ministry of Energy announced the results of the tender for the construction of a SPP with a capacity of 100 MW in the Navoi region[2]. Five companies participated in the tender - "ACWA Power" (Saudi Arabia), "Jinko Power" and "Aljoimah Energy & Water Consortium" (China / Saudi Arabia), "Masdar" (UAE), "TBEA Xinjianing Sunoasis Co Ltd" (China) and "Total Eren" (France) passed the pre-qualification stage of the tender. The tender was won by the UAE company Masdar with the lowest price[2].
In November 2019, the "Electricity Purchase Agreement" and "Investment Agreement" agreements were signed between the Masdar company and the Government of Uzbekistan in order to design, finance and build a solar park on the basis of public-private partnership.
On August 22, 2021, the first generating capacity of the Navoi Nur SPP was connected to the unified system of the republic[3].
On August 27, 2021, during the visit of President Shavkat Mirziyoyev to Navoiy Region, the photoelectric plant was officially launched[3]
References
- ↑ 1.0 1.1 "Masdar Celebrates Landmark 100 MW Nur Navoi Solar Project in Uzbekistan". Renewable Energy Magazine. 31 August 2021. Retrieved 19 December 2023.
- ↑ 2.0 2.1 "Uzbekistan to build solar power plants with a capacity of 5,000 MW within ten years". Tashkent: Kun.uz. Kun.uz. 7 December 2023. Retrieved 19 December 2023.
- ↑ 3.0 3.1 "First private PV plant launched in Navoi province". The Tashkent Times. The Tashkent Times. 2021-08-27. Retrieved 19 December 2023.
This article "Nur Navoi solar farm" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Nur Navoi solar farm. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
