You can edit almost every page by Creating an account and confirming your email.

PKP class ED70

From EverybodyWiki Bios & Wiki



PKP ED70
In service1958–1977
ManufacturerWaggonbau Görlitz
Built atWaggonbau Görlitz
Constructed1956
Entered service1958
Scrappedearly 1980s
Number built2
Number in service2
Number scrapped2
Formation4 cars per trainset
Capacity188 seats
Operator(s)PKP
Depot(s)Lokomotywownia Warszawa Grochów
Specifications
Train length88,250 mm (289 ft 6 in)
Doors4
Maximum speed135 km/h (85 mph)
Weight224 tonnes (220 long tons; 247 short tons)
Power output1,160 kW (1,556 hp)
Track gauge1,435 mm (4 ft 8 12 in)

ED70 is a four-carriage electric multiple unit built by Waggonbau Görlitz for Polish National Railways (PKP). They were built operating express trains on the newly electrified Warszawa - Katowice route. These multiple units ended their express service in 1968 and moved to charter service. In 1977, these multiple units retired and were scrapped.

References

  • This article is based on the corresponding [1] [2]


This article "PKP class ED70" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:PKP class ED70. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.

  1. locomotive.com.pl
  2. Atlas Lokomotyw Elektrycznych by Paweł Terczyńki 2017