Paramount Solar Park
| Paramount Solar Park | |
|---|---|
| Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). | |
| Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value). | |
| Official name | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Country | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Location | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Coordinates | 18°59′21″N 75°45′36″E / 18.9891°N 75.7601°ECoordinates: 18°59′21″N 75°45′36″E / 18.9891°N 75.7601°E Fatal error: The format of the coordinate could not be determined. Parsing failed. |
| Status | Decommissioned |
| Construction began | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Commission date | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Decommission date | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Construction cost | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Owner(s) | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Operator(s) | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Employees | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Min. source temp. | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Wells | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Hot water output | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Reactors | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Reactor supplier | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Solar farm | |
| Type | Flat-panel PV |
| Site resource | 5.5-6.0 kWh/m2 per day[1] |
| Primary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Secondary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Tertiary fuel | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Crosses | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Site area | 2,600 acres (11 km2) |
| Chimneys | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Cooling towers | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Cooling source |
|
| Annual revenue | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Thermal capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Power generation | |
| Units under const. | 500 MW |
| Nameplate capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Capacity factor | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Annual net output | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Storage capacity | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| External links | |
| Website | Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value). |
| Commons | [[Commons:Category:Lua error in Module:Wikidata at line 446: attempt to index field 'wikibase' (a nil value).|Related media on Commons]] |
Paramount Solar Park is a solar energy park in Patoda, Beed subdivision of Beed district in the Indian state of Maharashtra. It is the largest private-sector solar park approved by the Solar Energy Corporation of India (SECI) under the Jawaharlal Nehru National Solar Mission in India.[2] The park is spread over 2,600 acres (11 km2). The park is proposed to have a capacity of 500 MW.[3] Maharashtra has received bids for a tariff of Rs 4.42 per kWh in 2016, and it is expected the rates will decrease by the time K. P. Power/Paramount Solar Park is completed.[4]
See also
- Ultra Mega Solar Power Projects
- Solar Energy Corporation of India
- Ministry of New and Renewable Energy
- Jawaharlal Nehru National Solar Mission
References
- ↑ "India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory".
- ↑ "SECI - Statewise Solar Parks". Solar Energy Corporation of India (SECI). Retrieved 2018-09-14.
- ↑ "SOLAR PARKS Accelerating the Growth of Solar Power in India" (PDF). Ministry of New and Renewable Energy (MNRE). 2016-01-01. Retrieved 2018-09-14.
- ↑ Sengupta, Debjoy (2016-09-23). "Solar projects in Maharashtra receive Rs 4.42 per unit bid". Retrieved 2016-09-26.
This article "Paramount Solar Park" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Paramount Solar Park. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
