You can edit almost every page by Creating an account and confirming your email.

Remington Centre

From EverybodyWiki Bios & Wiki

Remington Centre Mall
Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value).
LocationMarkham, Ontario, Canada
Coordinates43°49′31.8″N 79°18′12.6″W / 43.825500°N 79.303500°W / 43.825500; -79.303500Coordinates: 43°49′31.8″N 79°18′12.6″W / 43.825500°N 79.303500°W / 43.825500; -79.303500
Fatal error: The format of the coordinate could not be determined. Parsing failed.


DeveloperRemington Group
ManagementRemington Group
OwnerRemington Group
ArchitectKohn Partnership Architects Inc. and Markham's Green Development
No. of stores and services700
No. of floors3
Websiteremingtoncentre.ca
Remington Centre
Traditional Chinese滙通廣場
Simplified Chinese汇通广场

Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018.[1] It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall, which should have begun in the third quarter of 2013,[2] but demolition began in October 2018.

The new mall will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and a signature night market.[3]

In 2009, plans were developed to demolish Market Village and replace it with a larger and more modern complex called the Remington Centre. It will feature a two-level structure with over 800,000 square feet (74,000 m2) of retail and commercial space and two condo towers (billed as The Grand Residences at Remington Centre) located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity.[4] It is currently unknown when the mall will be constructed and completed due to several delays.

Transportation access

The new mall, along with Pacific Mall, are located at the major intersection of Steeles Avenue and Kennedy Road. They are served by both the TTC (43 Kennedy and 53 Steeles East) and York Region Transit (8 Kennedy) buses, and located within walking distance from Milliken GO Station. The two entrance roads of the malls are Redlea Avenue and Clayton Drive. The railway crossing is being upgraded as an underpass, which will eliminate traffic tie-ups along Steeles.

References

  1. ↑ "Market Village closes its doors". blogTO. Retrieved 2018-04-02.
  2. ↑ "The Remington Centre will not be a strip club".
  3. ↑ http://www.remingtoncentre.ca/pdf/newsletter_201211_en.pdf [bare URL PDF]
  4. ↑ "In the Loop, July 2011" (PDF). Remington Group. Retrieved 29 January 2012.

Template:Shopping Malls in the Golden Horseshoe Template:Structures in Markham


This article "Remington Centre" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Remington Centre. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.