Schuylkill River Crossing Complex
Schuylkill River Crossing Complex New Betzwood Bridge | |
|---|---|
US 422 Bridge | |
| Coordinates | 40°06′27″N 75°25′12″W / 40.10750°N 75.42000°W Fatal error: The format of the coordinate could not be determined. Parsing failed. |
| Carries | |
| Crosses | Schuylkill River |
| Locale | Betzwood and Port Kennedy, Pennsylvania |
| Characteristics | |
| Material | concrete |
| History | |
| Construction start | Summer 2016 |
| Construction end | May 2020 |
| Opened | 1960s |
| Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value). | |
Schuylkill River Crossing Complex is a bridge that carries US 422 across the Schuylkill River. It also serves to connect Pennsylvania Route 23 and Pennsylvania Route 363, which was the source of much congestion in the area.[1] The $97 million project started in the summer of 2016 and was expected to be completed by May 2020.[2] The new bridge replaced a 1960s era bridge that connects Betzwood with Valley Forge.[3][4]
References
- ↑ "U.S. 422 BRIDGE OVER SCHUYLKILL RIVER & IMPROVEMENTS BETWEEN PA 363 AND PA 23 INTERCHANGES West Norriton Township – Upper Merion Township Montgomery County" (PDF). March 20, 2020.
- ↑ "U.S. 422 IN VALLEY FORGE". March 20, 2020.
- ↑ "US 422 River Crossing Complex". March 20, 2020.
- ↑ "$97 Million Project Will Build Bridges Over 422, Alleviate Traffic". January 27, 2016.
See also
This article "Schuylkill River Crossing Complex" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Schuylkill River Crossing Complex. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
