You can edit almost every page by Creating an account and confirming your email.

Trial 1

From EverybodyWiki Bios & Wiki



Arad 1
Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value).
Official nameLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
CountryLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
LocationLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Coordinates46°31′N 21°20′E / 46.52°N 21.34°E / 46.52; 21.34
Fatal error: The format of the coordinate could not be determined. Parsing failed.


StatusUnder construction
Construction beganLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Commission dateLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Decommission dateLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Construction costLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Owner(s)Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Operator(s)Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
EmployeesLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Min. source temp.Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
WellsLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Hot water outputLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
ReactorsLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Reactor supplierLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Solar farm
TypeFlat-panel PV
CollectorsLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Primary fuelLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Secondary fuelLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Tertiary fuelLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
CrossesLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
ChimneysLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Cooling towersLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Cooling source
  • Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
  • Lua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Annual revenueLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Thermal capacityLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Power generation
Nameplate capacityLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Capacity factorLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Annual net outputLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Storage capacityLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
External links
WebsiteLua error in Module:WikidataIB at line 665: attempt to index field 'wikibase' (a nil value).
Commons[[Commons:Category:Lua error in Module:Wikidata at line 446: attempt to index field 'wikibase' (a nil value).|Related media on Commons]]

Arad 1 will be the largest solar park ever built in Romania with an installed capacity of 1057.5 MW and one of the largest in Europe. The cost is estimated at 800 million euros for the solar park, but it will also have storage using batteries that will cost an additional 200 million euros. Total cost of the project is expected to be 1 billion euros.

Resolv Energy acquired from West Power Investments (part of the Monsson Group) late-stage development rights for the planned solar park.[1]

The construction permit was given by Grăniceri and Pilu municipality in 08.06.2023.[2]

The park is expected to be operational by 2024.[3][4]

Technical details

The park will consist of 1,706,302 solar mono-crystalline panels, 310 stations for conversion, 9 transformer sub-stations for 33/110 kV, one main transformer station for 33/110/400 kV and a station for the 400kV connection to 400kV Nadab-Bekecssaba. [5]

References

  1. Todorović, Igor (2022-11-02). "Construction of solar power plant of over 1 GW to start in June in Romania". Balkan Green Energy News. Retrieved 2023-06-03.
  2. "Două primării din Arad, mult mai bogate. S-a eliberat autorizația de construire pentru cel mai mare parc fotovoltaic din Europa · Special Arad". specialarad.ro (in română). 2023-06-13. Retrieved 2023-11-04.
  3. "Cel mai mare parc fotovoltaic din Europa se construiește la Arad și va costa 800 de milioane de euro". euronews.ro: Știri de ultimă oră, breaking news, #AllViews (in română). Retrieved 2023-06-03.
  4. "Arad: Construirea cu 800.000.000 de euro a celui mai mare parc fotovoltaic din Europa începe în vară".
  5. "O coloană cu 23.000 de TIR-uri, de la Arad la Râmnicu Vâlcea, pentru parcul fotovoltaic de la Pilu-Grăniceri · Special Arad". specialarad.ro (in română). 2023-09-05. Retrieved 2023-11-04.


This article "Trial 1" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Trial 1. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.