Bob Sikes Bridge
The Bob Sikes Bridge, also known locally as the Pensacola Beach bridge, is a toll bridge that runs between Gulf Breeze, Florida and Pensacola Beach. It carries four lanes of State Road 399 across Santa Rosa Sound.
As of June 2021, the cost of the toll is $1 per vehicle, plus a $2.50 surcharge per billing cycle when using toll-by plate. The administrative fee is waived for customers using SunPass, E-Pass, a NC Quick Pass, Peach Pass, or for tolling apps.
The Santa Rosa Island Authority also offers their own annual pass, which lets you pass an unlimited number of times for a one time annual fee.[1]
Bob Sikes Bridge | |
---|---|
View of southbound lane of bridge from Gulf Breeze, from bicycle lane, during the Memorial Day weekend of 2021. | |
Coordinates | Lua error in Module:Coordinates at line 611: attempt to index field 'wikibase' (a nil value). |
Carries | 4 lanes of Florida State Road 399 |
Crosses | Santa Rosa Sound |
Locale | Gulf Breeze, Florida, and Pensacola Beach, Florida, U.S |
Official name | Robert L. Sikes Bridge |
Maintained by | Escambia County, Florida |
Characteristics | |
Design | Reinforced concrete girder bridge |
Total length | 43,727 feet (0.7 miles) |
Width | 35 feet per span |
Clearance below | 65 Feet |
History | |
Opened | 1974 |
Statistics | |
Daily traffic | 11,079 (2015)[2] |
Toll | $1.00 per trip, plus monthly surcharge of $2.50. Toll only for southbound travel. |
Lua error in Module:Infobox_mapframe at line 118: attempt to index field 'wikibase' (a nil value). |
History[edit]
The bridge, which is dedicated to the former congressman Bob Sikes, was opened in the Mid- 1970's, replacing the aging and narrow two-lane facility to the east of the current structures. Today, the original structure remains intact, and serves as two fishing piers, with each accessible from their respective end of the bridge.
In 2020, work began on a $4.7 million rehabilitation and modernization project[3] for the aging bridge, so keep the bridge sturdy for the remainder of its structural lifespan, as of June 1, 2021 to be estimated to be an additional 10-15 years. However, construction work continued into early 2021, due to effects of the Coronavirus pandemic, and effects of Hurricane Sally to the bridge.
In March 2020, the Santa Rosa Island Authority, the operator of the toll plaza, announced that they would be switching over to cashless tolls going forward. Previously, it was protested by residents of Pensacola Beach and Gulf Breeze, notably because of the administrative surcharge they would add every month, but there was no significant backlash when they implemented it in 2020.
See also[edit]
References[edit]
- ↑ "Pensacola Beach". Unknown parameter
|url-status=
ignored (help) - ↑ [1]
- ↑ Little, Jim. "Bob Sikes Bridge rehab starts Wednesday, prepare for lane closures and delays". Pensacola News Journal. Retrieved 2021-06-01.
External links[edit]
Media related to [[commons:Lua error in Module:WikidataIB at line 466: attempt to index field 'wikibase' (a nil value).|Lua error in Module:WikidataIB at line 466: attempt to index field 'wikibase' (a nil value).]] at Wikimedia Commons
This article "Bob Sikes Bridge" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Bob Sikes Bridge. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
- Bridges completed in 1974
- Buildings and structures in Gulf Breeze, Florida
- Transportation buildings and structures in Escambia County, Florida
- Road bridges in Florida
- Florida State Road 399
- Toll bridges in Florida
- 1974 establishments in Florida
- Concrete bridges in the United States
- Girder bridges in the United States