Camp Aguinaldo station
Camp Aguinaldo | ||
|---|---|---|
| File:2025-07-16 – PBBM eyes inauguration of Metro Manila Subway project by 2028 (07).jpg The station under construction in July 2025 | ||
| Location | Camp Aguinaldo, Col. Bonny Serrano Avenue Socorro, Quezon City, Metro Manila | |
| Coordinates | 14°37′09″N 121°03′42″E / 14.6192°N 121.0617°ECoordinates: 14°37′09″N 121°03′42″E / 14.6192°N 121.0617°E Fatal error: The format of the coordinate could not be determined. Parsing failed. | |
| Owned by | Department of Transportation | |
| Operated by | Department of Transportation | |
| Line(s) | Lua error: expandTemplate: template "Manila MRT color" does not exist. | |
| Construction | ||
| Structure type | Underground | |
| Other information | ||
| Status | Under construction | |
| Station code | Template:Manila MRT station code | |
| History | ||
| Opening | c. 2032 | |
| Previous names | Katipunan | |
| Services | ||
|
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Manila MRT' not found. | ||
Camp Aguinaldo station (originally referred to as Katipunan station during early alignment planning) is an under-construction underground Metro Rail Transit (MRT) station located on the Metro Manila Subway (Line 9) system in Quezon City, Metro Manila, Philippines.
The underground station is situated inside the perimeter of Camp General Emilio Aguinaldo, the national military headquarters of the Armed Forces of the Philippines. It sits close to Col. Bonny Serrano Avenue, serving military personnel, base residents, and the surrounding commercial neighborhoods of Barangay Socorro and the lower Katipunan corridor.
History
To construct that station, the DOTr forged a landmark right of way agreement with the Department of National Defense (DND) in December 2020. This granted the project temporary and permanent use of 50,000 square meters (540,000 sq ft) of land inside the active military base for structural excavation.[1] The build contract for the site was finalized as part of Contract Package 103 (CP103) with Sumitomo Mitsui Construction Co., Ltd. in November 2022.[2][3]
The station's groundbreaking ceremony took place inside Camp Aguinaldo on February 13, 2023, led jointly by DOTr Secretary Jaime Bautista and Defense Secretary Carlito Galvez Jr.[4] Due to its position inside a secure military base, an Advanced Works Package was deployed ahead of time to build perimeter adjustments and structural support walls before massive cut-and-cover excavation works began. The station is expected to open inline with the network's system-wide launch by c. 2032.[1]
References
- ↑ 1.0 1.1 "Metro Manila Subway Project, Philippines". Railway Technology. September 15, 2023. Retrieved June 21, 2026.
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedEOJ-signing - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedQC-signing - ↑ De Leon, Susan (February 13, 2023). "Metro Manila Subway Project breaks ground for CP 103's Anonas, Camp Aguinaldo Stations". Philippine Information Agency. Retrieved June 21, 2026.
This article "Camp Aguinaldo station" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Camp Aguinaldo station. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.