Construction Management (CM) refers to design-bid-build project delivery method with Construction Manager as a specialist in advanced planning, value engineering, construction procurement enabling, and organizing construction process, allowing for phased, fast-track project delivery, where multiple design packages are tendered prior to final design completion, thus allowing for reduction in the time needed to complete construction project.[1]
Construction Managers may act as Owner's advisors only (CM as Advisor[2][1], CM as Agent), in which case the Owner is directly contracting with trade contractors, or Construction Manager may undertake the responsibility of hiring trade contractors, or subcontractors, while Owner maintains direct contractual relationship only with Construction Manager, then known as CM at Risk[3][4][1], or CM as Advisor and Constructor.
References[edit]
- ↑ 1.0 1.1 1.2 Surahy, Akhtar (2018). Understanding Construction Contracts. Canadian and International Conventions. Springer Cham. pp. 40–42. doi:10.1007/978-3-319-66685-3. ISBN 978-3-319-66684-6. Search this book on
- ↑ "Construction Manager as Advisor (CMa) | Practical Law". ca.practicallaw.thomsonreuters.com. Retrieved 2022-10-03.
- ↑ "Construction manager at-risk". www.designingbuildings.co.uk. Retrieved 2022-10-03.
- ↑ Clockwork.net. "Construction Manager at Risk Project Delivery Method Now Permitted for Iowa Public Projects - Fredrikson & Byron · Fredrikson & Byron, P.A." Fredrikson & Byron. Retrieved 2022-10-03.
This article "Construction Management (Project Delivery Method)" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Construction Management (Project Delivery Method). Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.