Northern Access Link Expressway
| Northern Access Link Expressway | |
|---|---|
| NALEX | |
| Lua error in Module:Infobox_road/map at line 15: attempt to index field 'wikibase' (a nil value). | |
| Route information | |
| Maintained by SMC Northern Access Link Expressway Corporation | |
| Length | 136.4 km[1] (84.8 mi) Phase 1 – 19.4 km (12.1 mi) Phase 2 – 117 km (73 mi) |
| Status | Under construction |
| Restrictions | No motorcycles below 400cc |
| Major junctions | |
| South end | E2 (Skyway Stage 3) at Balintawak in Caloocan |
| North end | E1 (Tarlac–Pangasinan–La Union Expressway) in Tarlac City |
| Location | |
| Provinces | Bulacan, Pampanga, Tarlac |
| Major cities | Caloocan, Valenzuela, Malabon, Obando, Bulakan, Malolos, Tarlac City |
| Highway system | |
| Roads in the Philippines | |
The Northern Access Link Expressway (NALEX) is a 136.4 km (84.8 mi) under-construction controlled-access toll expressway in the Philippines.[1] It is designed to connect Metro Manila directly to the New Manila International Airport (NMIA) in Bulakan, Bulacan, and extend further north across Pampanga to terminate at Tarlac City.[2]
The tollway is being constructed under a 30-year Supplemental Toll Operation Agreement (STOA) granted by the Toll Regulatory Board (TRB) to San Miguel Corporation (SMC).[3] NALEX serves as Component 1 of SMC's Greater Capital Region Integrated Expressways Network.[1]
Route description
NALEX combines elevated viaducts and at-grade expressways split across two main phases:
Phase 1
Phase 1 spans 19.4 km (12.1 mi).[3] The expressway originates at the northern end of Skyway Stage 3 at the Balintawak Interchange in Caloocan via an elevated viaduct. It proceeds northwards through Valenzuela, Malabon, and Obando before leading directly into the New Manila International Airport complex in Bulakan, Bulacan.[1]
Phase 2
Phase 2 spans 117 km (72.7 mi) as an extension from the airport site in Bulakan.[3] The alignment travels along coastal and inland areas of Bulacan and Pampanga (including Masantol) before heading north to connect with the Tarlac–Pangasinan–La Union Expressway (TPLEX) in Tarlac City.[2]
History
On May 6, 2022, the Toll Regulatory Board (TRB) approved the Supplemental Toll Operation Agreement (STOA) for NALEX with an estimated project cost of ₱148.30 billion.[3] SMC Northern Access Link Expressway Corporation was designated as the concessionaire, while Skyway O&M Corporation was appointed as the tollway operator.
The Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate (ECC) for NALEX Phase 1. Final engineering designs (FED) were subsequently submitted by SMC to the TRB and the Department of Public Works and Highways (DPWH) for final technical review and notice to proceed.[2]
Exits
Exits will be numbered by kilometer markers. Locations and final interchange designs for Phase 1 are based on the alignment published by SMC Infrastructure and the Toll Regulatory Board.
Phase 1, Section 1 (Balintawak to NMIA)
| Region | Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|---|
| Metro Manila | Caloocan | Skyway Stage 3 / Balintawak Interchange | E2 (Skyway) | Southern terminus | ||||
| Valenzuela | No major junctions | |||||||
| Malabon | No major junctions | |||||||
| Central Luzon | Bulacan | Obando | No major junctions | |||||
| Bulakan | NMIA Interchange | New Manila International Airport | Cloverleaf interchange; northern terminus for Phase 1, Section 1; starting point for Phase 1, Section 2 (to TPLEX) and Marilao Access Link Expressway | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Phase 1, Section 2 (NMIA to Tarlac City)
Phase 1, Section 2 covers the main at-grade expressway entirely within Central Luzon, running from NMIA to TPLEX in Tarlac City and including the BTEX Tabang Link spur.
| Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Bulacan | Bulakan | NMIA / Bulakan Interchange | New Manila International Airport | Southern terminus for Phase 1, Section 2; junction with BTEX Tabang Link | |||
| Guiguinto | Tabang Interchange | Terminus of the BTEX Tabang Link spur; connects to NLEX (Sta. Rita Exit area) | |||||
| Pampanga | Masantol | Masantol Interchange | Local roads | Interchange along Phase 1, Section 2 main alignment; junction for proposed Phase 2 expansion | |||
| Guagua | Guagua Interchange | Local roads | Phase 1, Section 2 alignment | ||||
| Porac | Porac Interchange | E1 (Subic–Clark–Tarlac Expressway) | Phase 1, Section 2 interchange with SCTEx | ||||
| Mabalacat | Mabalacat Interchange | Clark Freeport and Special Economic Zone | Phase 1, Section 2 alignment near Clark area | ||||
| Tarlac | Capas | Capas Interchange | New Clark City | Phase 1, Section 2 alignment | |||
| Tarlac City | TPLEX / Tarlac City Interchange | E1 (Tarlac–Pangasinan–La Union Expressway) – Baguio | Northern terminus of Phase 1, Section 2 connecting to TPLEX | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
See also
References
- ↑ 1.0 1.1 1.2 1.3 "Northern Access Link Expressway". SMC Infrastructure. Retrieved August 6, 2026.
- ↑ 2.0 2.1 2.2 Jose, Ashley Erika O. (November 21, 2024). "TRB sees implementation of 3 SMC toll road projects next year". BusinessWorld. Retrieved August 6, 2026.
- ↑ 3.0 3.1 3.2 3.3 "SMC to proceed with full-blast NALEX construction by Q4". Daily Tribune. June 26, 2024. Retrieved August 6, 2026.
External links
Template:Philippine expressway network
This article "Northern Access Link Expressway" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Northern Access Link Expressway. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.
