You can edit almost every page by Creating an account and confirming your email.

Central Mindanao Expressway

From EverybodyWiki Bios & Wiki

Template:Prod llm/dated

Central Mindanao High Standard Highway
Central Mindanao Expressway
Lua error in Module:Infobox_road/map at line 15: attempt to index field 'wikibase' (a nil value).
Route information
Length65 km (40 mi)
Major junctions
North endTagoloan
South endMalaybalay
Location
ProvincesMisamis Oriental, Bukidnon
Highway system
Roads in the Philippines

The Central Mindanao High Standard Highway (CMHSH), also known as the Central Mindanao Expressway, is a proposed controlled-access highway in Northern Mindanao, Philippines. The project aims to provide a high-speed corridor between Cagayan de Oro and Davao City, bypassing the existing Sayre Highway.

Route description

The first phase of the project covers a length of 65 kilometers (40 mi), spanning the provinces of Misamis Oriental and Bukidnon. The route originates at a major interchange in Tagoloan, positioned to serve the PHIVIDEC Industrial Estate. In the future, the expressway will be extended to Davao City.

History

Planning

The project was identified as a "highest priority" corridor in the Master Plan for High Standard Highway Network Development (Phase 2), conducted by the Japan International Cooperation Agency (JICA) in 2021.[1]

In June 2024, JICA released the definitive Preparatory Survey for the Central Mindanao High Standard Highway Project, which finalized the engineering designs for the Cagayan de Oro–Malaybalay section. The report specified the use of Japanese technology for seismic resilience and PC box girders with corrugated steel-webs to handle the region's mountainous terrain.[2]

Financing

The highway utilizes a hybrid financing model involving both Japanese and multilateral development bank support:

  • JICA: On March 27, 2026, a loan agreement was signed for Section 1 (approx. 12 km (7.5 mi)) within Cagayan de Oro City.[3]
  • ADB: The Asian Development Bank (ADB) and other development partners is slated to finance Sections 2 through 5 (approx. 53 km (33 mi)) through the Infrastructure Preparation and Innovation Facility (IPIF).[4][3]
  • National Budget: On March 23, 2026, the Philippine government issued a Forward Obligational Authority (FOA) of ₱145.56 billion to secure funding through 2034.[5]

Exits

This entire route is located in Northern Mindanao. Exits will be numbered by kilometer posts. 

ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
Misamis OrientalTagoloanCagayan de Oro N9 (Butuan–Cagayan de Oro–Iligan–Tukuran Road) – Cagayan de OroNorthern terminus
Toll Plaza
BukidnonManolo FortichMambatangan N9 (Sayre Highway)Trumpet interchange
Manolo FortichLindaban-Dahilayan RoadTrumpet interchange
ImpasugongImpasugong N9 (Sayre Highway)Trumpet interchange
MalaybalayDalwangan N9 (Sayre Highway)Trumpet interchange
Malaybalay N9 (Sayre Highway)Southern terminus of Phase 1; future extension to Davao City
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened


References

  1. Master Plan for High Standard Highway Network Development (Phase 2) - Final Report (PDF) (Report). Japan International Cooperation Agency. 2021.
  2. Preparatory Survey for Central Mindanao High Standard Highway Project (Cagayan de Oro-Malaybalay section): Final Report (Advanced Version) (PDF) (Report). JICA. June 2024.
  3. 3.0 3.1 "Signing of Japanese ODA Loan Agreements" (Press release). JICA. March 27, 2026.
  4. Infrastructure Preparation and Innovation Facility - PAM (PDF) (Report). ADB. 2023.
  5. "Release of P145.56-B for Central Mindanao Highway". DBM. March 23, 2026.

External links

Template:Philippine expressway network


This article "Central Mindanao Expressway" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:Central Mindanao Expressway. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.