You can edit almost every page by Creating an account. Otherwise, see the FAQ.

List of unused highways in North Carolina

From EverybodyWiki Bios & Wiki

An unused highway may reference a highway or highway ramp that was partially or fully constructed but was unused[1][2][3][4][5][6][7][8][9] or later closed.[10][11][12] An unused ramp can be referred to as a stub ramp,[13] stub street,[2][14][15] stub-out,[2] or simply stub.[16][17] The following is a list:

North Carolina[edit]

Bryson City[edit]

  • Dubbed "The Road To Nowhere", the road that was intended to replace flooded Highway 288 became too costly and construction ceased on February 2, 1944. Much of the 7.2 miles (11.6 km) of road leading west from Bryson City can be driven, but barriers prevent vehicle traffic beyond the Forney Ridge tunnel. In February 2010 the US Department of Interior settled with Swain County for $52 million for failing to complete the project. [12]

Cary[edit]

  • There is a bridge to nowhere crossing over the Triangle Expressway which will eventually carry Morrisville Parkway, which currently ends at stubs to the east and west of the overpass.[13] The parkway is being completed in phases by both the town of Cary and private developers and will eventually connect.[18]

Charlotte[edit]

  • Two stubs of Galloway Rd. exist on either side of I-85 south of the I-485 interchange near Concord Mills. The western stub extends quite a way past the active roadway while the eastern stub is much shorter.[19]
  • An unused portion of Statesville Rd exists near the I-77 and I-485 interchange near Huntersville. The road is connected to the current Statesville Rd. alignment, although there are no destinations on the road.[20]
  • With the opening of Interstate 277, there are residual bridges and pavement present along the former alignment of U.S. Route 74 (Independence Boulevard). Parts of this road are now known as Wilkinson Boulevard, the John Belk Freeway (part of Interstate 277), Carson Boulevard, Stonewall Street, South Street and Charlottetowne Avenue. A bridge that once carried six lanes of traffic is now a single-lane ramp from eastbound U.S. 74/Wilkinson Boulevard to southbound Interstate 77. [14] Another multi-lane, old bridge was used as an exit for Carson Boulevard. [15] A sign of former Independence Boulevard is visible at Stonewall Street as South Boulevard transitions into Caldwell Street and Brevard Street, although this interchange is currently being reconstructed. [16] Independence Boulevard once had an interchange at South Boulevard, but this was removed during construction of I-277, where a replacement interchange was built. Independence Boulevard currently exists as a freeway/at-grade expressway serving the eastern areas of Charlotte, as well as the suburbs of Matthews and Indian Trail.[21]
  • A now-closed stub ramp exists as a former on-ramp from North Graham Street to Interstate 277 north in Uptown. [17] It was closed after 1998 when the North Carolina Department of Transportation rebuilt and relocated the CSX Transportation and Norfolk Southern rail lines.[22][23] [18] The old alignment can be seen here.

Durham[edit]

  • Grading still exists adjacent to Interstate 85 at the northern terminus of NC 147 for what was previously an exit for U.S. Route 70 Business / Hillsborough Road. [19] Removed in the early 1990s, this was a directional interchange that featured a brief overlap/end of U.S. 70 Business with I-85. Two bridges on northbound I-85 were removed; one crossed over an onramp from westbound U.S. 70 Business to southbound I-85 that entered to the left of the southbound lanes, and the other crossed over an offramp from the left side of southbound I-85 to westbound U.S. 70 Business. Here is the old configuration. Part of the original alignment of the southbound lanes is used by the new onramp from northbound NC 147. U.S. 70 Business/Hillsborough Road now runs alongside the interstate as a frontage road in the right-of-way of the former off-ramp.
  • Grading also exists on NC 147 for a connection to U.S. Route 70 / Miami Boulevard. Heading from Durham toward Research Triangle Park, the road curves after Exit 10 (Briggs Avenue). The bridges over Ellis Road are wide enough to handle three lanes of traffic, but are only marked for two. The southbound bridge is aligned for a left-hand exit to the "East End Connector" to U.S. 70, and the northbound bridge is designed to handle the traffic to NC 147 north from the on-ramp. [20] After the Ellis Road bridge, the right-of-way widens. The southbound lane is higher than the northbound lane, and the road is graded to accept a left-hand entry ramp to NC 147 south from the connector that would pass over the northbound lane without regrading or reconstruction. In March 2015, construction began on the long-awaited East End Connector.[24]
  • A stub of NC 147's previous terminus at T.W. Alexander Road is visible south of the intersection of T.W. Alexander Road and NC 54. This exit was permanently closed to make way for NC 147's extension to NC 540 in Morrisville.[21]

Gastonia[edit]

  • Ramp stubs mark what was once a temporary endpoint of Interstate 85. The ramps shuttled I-85 traffic to and from U.S. Route 29 and U.S. Route 74 (Franklin Boulevard). The bridge that carried the I-85 offramp is now an overpass for Aberdeen Boulevard, a connector street that runs between Franklin Boulevard and Cox Road.[25] Viewable at [22]

Greensboro[edit]

  • Interstate 840 is a planned 40-mile (64 km) (estimated) east-west route forming the northern half of an urban loop around Greensboro. It is currently only signed (albeit with a FUTURE sign) and constructed for 2 miles (3 km) and ends at U.S. Route 70 on the east end of the loop.[26][27] There are mainline stubs on both the east- and westbound lanes for the future extension around the north side to the west side of the city to exit 212, where Interstate 40 will branch into Business Interstate 40 upon completion of the Greensboro Urban Loop,[27] though the I-840 loop is not scheduled to be completed for quite some time. Interstate 785 is also supposed to be concurrently routed with I-840 on the east end.[26] [23]
  • Interstate 840 is also being constructed through the western side of the city and will have a short concurrency with Interstate 73 as part of the Greensboro Urban Loop construction. Stubs, grading, and unfinished ramps can be seen at the Bryan Boulevard interchange, where I-73 will head west and I-840 will continue north.[26] Construction is not to take place until 2013.[27] [24]

Greenville[edit]

Jacksonville[edit]

  • Ramp stubs and grading are visible at the interchange between U.S. Route 17, Business U.S. 17, and Jacksonville Parkway.[25]

New Bern[edit]

  • A partially completed cloverleaf interchange sits where U.S. Route 17 abruptly ends at U.S. Route 70, from where both routes are signed concurrently to the east.[26]
  • Directly to the east of the above interchange, North Carolina Highway 43 ends at U.S. Route 70, but stubs exist to the south, pointing towards potential future extension.[27]

Pittsboro[edit]

  • A completed, unused bridge over the bypass route of US 64 can be accessed by a secondary road, but dead ends at one part. It is expected for the connecting roads to be completed in 2017.[28][32]

Raleigh[edit]

  • Interstate 540 was intended to be a full beltway around the city (based on mile markers[33] and signage that was removed[34]) and was known as the Outer Loop so as not to be confused with Interstate 440. The North Carolina General Assembly in 2005 approved the creation of the North Carolina Turnpike Authority, whose first project was the Western Wake Expressway, which was the portion of I-540 south of Interstate 40. In early 2006, the authority reversed the designation and decided that they wanted the entire stretch of I-540 south of I-40 to be a toll road. This led to the removal of I-540 insignia and the posting of NC 540 insignia. With this change, the North Carolina Department of Transportation would not have the money to build the beltway as a free highway until 2032.[35] As a result of all of this, many stubs of pavement exist at I-540's eastern terminus [29] and at NC 540's western terminus. [30]
  • Three interchanges along the Interstate 440 beltway are no longer a full cloverleaf configuration. They include Exit 4 (Wade Avenue) [31], Exit 7 (Glenwood Avenue)[32], and Exit 13 (New Bern Avenue) [33]. Grading is still clearly visible.

Wendell[edit]

  • Ramp grading is visible along U.S. Route 64 at the junction with Rolesville Road. This intersection used to be a full diamond interchange; US 64 formerly terminated at the present-day US 64 Business immediately to the south. The eastbound ramps were removed in the 2000s to make room for the interchange for US 64/US 64 Business when US 64 was extended to the south, making the Rolesville Road junction a partial-diamond.[34]

Wilmington[edit]

  • As of October 2014, Google satellite imagery shows stub ramps at the northbound on-ramps and southbound off-ramps, as well as mainline stubs, of I-140 at the interchange with U.S. 74/U.S. 76 near Leland. A short mainline stub exists on southbound I-140 at its interchange with U.S. 421 north of the city. Grading has begun for mainline and ramps between the two interchanges with stub ramps possible. The remaining sections of I-140 are completed.[36]

Winston-Salem[edit]

  • There are 5 stub ramps around the interchange of U.S. 311 and Interstate 40 east of Waughtown.[37]
  • A stub ramp exists as part of Metropolitan Dr. and E. 2nd St. near Research Parkway near Downtown. Another is located on the other end of Metropolitan Dr., north of E. 5th St. on U.S. 52/U.S.311. Both ramps used to be part of Exit 110A which was closed in 2012.[38]
  • Construction at Exit 59 on I-74 near Union Cross may lead to new stub ramps as the existing ramps are reconfigured.[39]

See also[edit]

References[edit]

  1. "US&R and NY-TF1 Practice for the Real Thing." City of New York 20 June 2005. 15 Jan. 2007 "Archived copy". Archived from the original on 2006-10-14. Retrieved 2012-03-19.CS1 maint: Archived copy as title (link).
  2. 2.0 2.1 2.2 "Kentucky Model Access Management Ordinance." Kentucky Transportation Cabinet Oct. 2004. 15 Jan. 2007 "Archived copy" (PDF). Archived from the original (PDF) on 2006-09-26. Retrieved 2012-03-19.CS1 maint: Archived copy as title (link).
  3. "Barrie (City) v. 1606533 Ontario Inc.", 2005 CanLII 24746 (ON S.C.). 15 Jan. 2007 [1][permanent dead link].
  4. Iowa House. 1998. House File 686., 77th, H.R. 0686. [2] [3].
  5. "PETITIONED PUBLIC HEALTH ASSESSMENT." New York City. 15 Jan. 2007 [4].
  6. House. 1993. LAND TITLE AMENDMENT ACT, 1993. 35th Parliament, 2nd sess., H.R. 78. [5].
  7. Munroe, Tapan. "TRENDS ANALYSIS for PARKS & RECREATION: 2000 AND BEYOND." California Park & Recreation Society Jan. 1999. 15 Jan. 2007 "Archived copy" (PDF). Archived from the original (PDF) on 2006-10-09. Retrieved 2007-01-15.CS1 maint: Archived copy as title (link)
  8. "Chapter 5: Detailed Comparison of Alternatives – Seattle." SR 520 Bridge Replacement and HOV Project, Washington Department of Transportation, 2 May. 2005. 15 Jan. 2007 "Archived copy" (PDF). Archived from the original (PDF) on 2007-10-09. Retrieved 2007-01-15.CS1 maint: Archived copy as title (link) [6] Archived 2011-05-15 at the Wayback Machine.
  9. Anderson, Steve. "CT 11 Expressway." New York City Roads. 15 Jan. 2007 [7].
  10. "Leasing of Closed Highways Regulation", Alta. Reg. 36/1986. 15 Jan. 2007 "Archived copy". Archived from the original on 2007-09-29. Retrieved 2007-11-22.CS1 maint: Archived copy as title (link).
  11. "R. v. Sanders", 2004 NBPC 12 (CanLII). 15 Jan. 2007 [8][permanent dead link].
  12. "HIGHWAY CLOSINGS", R.R.O. 1990, Reg. 599. 15 Jan. 2007 "Archived copy". Archived from the original on 2007-09-29. Retrieved 2007-11-24.CS1 maint: Archived copy as title (link).
  13. "Washington State Department of Transportation Public Transportation and Rail Division Monthly News, October 2006, page 4" (PDF). Archived from the original (PDF) on 2006-10-08. (286 KiB), accessed December 28, 2006
  14. Sommer, Dick. "Ten Ways to Manage Roadway Access in Your Community." Ohio Department of Transportation, 2005. 15 Jan. 2007 [9][permanent dead link].
  15. Bauserman, Christian E. "DELAWARE COUNTY ENGINEER’S DESIGN, CONSTRUCTION & SURVEYING STANDARDS." 18 May 1998. 15 Jan. 2007 [10][permanent dead link].
  16. Geiger, Gene. "Ohio DOT Constructs I-670 over a Water Treatment Sludge Lagoon in Columbus." Ohio LTAP Quarterly. Ohio Department of Transportation. 15:3 (1999) [11].
  17. "CITY OF UNION, KENTUCKY." City of Union, Kentucky 23 June 2006. 15 Jan. 2007 "Archived copy". Archived from the original on 2007-09-27. Retrieved 2012-03-19.CS1 maint: Archived copy as title (link).
  18. "Morrisville Parkway Extension and NC 540 Interchange". Town of Cary. Archived from the original on 2016-12-15. Retrieved December 13, 2016.
  19. "Google Maps".
  20. "Google Maps".
  21. Prince, Adam. "Tracing Charlotte's Independence Blvd". gribblenation.com.
  22. "Status of the Downtown Charlotte Multi-Modal Station" (PDF). North Carolina Department of Transportation-Rail Division.
  23. "Basic Rail Plans". Historic Preservation of Elmwood/Pinewood Cemetery, Inc. Archived from the original on 2008-01-22. Retrieved 2007-11-24.
  24. "East End Connector". North Carolina Department of Transportation. Archived from the original on 2015-06-23. Retrieved May 30, 2015.
  25. Prince, Adam. "Carolina Lost - I-85 Connector Ramps - Gastonia, NC". gribblenation.com.
  26. 26.0 26.1 26.2 "Interstate 840 North Carolina". AARoads.com.
  27. 27.0 27.1 27.2 Malme, Bob. "I-73 Segment 4". Bob Malme. Archived from the original on 2009-01-01.
  28. "NCDOT: Greenville Southwest Bypass". www.ncdot.gov. Archived from the original on 2018-02-25. Retrieved 2018-04-17.
  29. "U.S. 264 bypass will ease Greenville jams". newsobserver. Retrieved 2018-04-17.
  30. "Target Southwest Bypass completion pushed back - Daily Reflector". www.reflector.com. Retrieved 2018-04-17.
  31. "Road work: Greenville S.W. Bypass moves along - Daily Reflector". www.reflector.com. Retrieved 2018-04-17.
  32. "Chatham Parkway Bridge Construction in Pittsboro NC - Eric Andrews Realtor". Eric Andrews Realtor. 2015-05-13. Retrieved 2017-06-20.
  33. LeBlanc, Brian. "Interstate 540/NC 540 Exit List". gribbnation.com.
  34. Siceloff, Bruce (2007-07-10). "Oops' won't stall 540 opening". The News & Observer. Archived from the original on 2007-10-17. Retrieved 2007-11-05.
  35. LeBlanc, Brian. "I-540/NC 540". Wake County Roads.
  36. "Google Maps".
  37. "Google Maps".
  38. "NCDOT News Release: NCDOT to Close U.S. 52; Third, Fourth, Fifth Street Ramps in Winston-Salem Starting Sunday Night". NCDOT. June 7, 2012. Archived from the original on 2014-04-19. Retrieved April 6, 2015.
  39. "Google Maps".

Template:Lists of unused highways by U.S. state


This article "List of unused highways in North Carolina" is from Wikipedia. The list of its authors can be seen in its historical and/or the page Edithistory:List of unused highways in North Carolina. Articles copied from Draft Namespace on Wikipedia could be seen on the Draft Namespace of Wikipedia and not main one.